Natural History Museum, 1010 Vienna

The restoration of the façade of the Natural History Museum built from 1871 to 1889 by G. Semper and K. Hasenauer was carried out between 2000 and 2010 in several work phases. Our company conducted the pilot project on the northeastern corner risalit of the façade along Bellariastraße as well as six sections of the façade (see Project Data). The façades were in an exceptionally deteriorated overall condition. The main challenge was the extreme degree of soiling and extent of efflorescence of the stone surfaces, especially on the ground floor façades. Figures and architectural elements were so completely covered by mineral deposits that it looked like they had been painted black. Moreover, large parts of the upper level had suffered severe weathering, causing complete loss of contours in individual elements. Our restoration work focused on a cleaning method that would remove deposits and restore contours lost to erosion (replacements made of artificial stone, indent repair, recasting of parts) yet be as gentle as possible on the stone itself. In this way it was possible to give the building a homogeneous overall image. Since 2009 we have increased our use of the Palladio Nd:YAG system for laser cleaning. In the case of the Natural History Museum it was applied to clean the limestone figures by thermomechanically loosening the unwanted layers. This process preserves fine traces of original workmanship without smoothing over or destroying the contours.


Project Data, 8th + 10th work phase (northeast corner risalit + central risalit/Bellariastrasse):

Address: 1010 Vienna, Burgring 7 

Service: Façade restoration

Service period: April 2009 to May 2010


Photo Gallery: 8th work phase

Photo Gallery: 10th work phase

Before restoration

Project Data, 3rd + 4th work phase (southeast central risalit + Façade wing/Museumsplatz):

Address: 1010 Vienna, Burgring 7 

Service: Façade restoration 

Service period: April 2002 to May 2003


Photo Gallery: 4th work phase

Before restoration

After restoration

Photo Gallery: 3th work phase

Before restoration


Project Data, 2nd work phase (southeast Façade wing/Museumsplatz):

Address: 1010 Vienna, Burgring 7 

Service: Façade restoration
Service period: June to November 2001


Photo Gallery: 2th work phase


Project Data, Pilot Project and 1st work phase (northeast corner risalit/Bellariastrasse):

Address: 1010 Vienna, Burgring 7 

Service: Façade restoration
Service period: April 2000 to April 2001


Photo Gallery: 1th work phase

Before restoration